|
|
TM 9-2350-238-20-1
2-35. MAINTENANCE OF POWERPLANT.
b. Inspection/Repair
c. Installation
This task covers:
a. Removal
INITIAL SETUP
Equipment Conditions
Tools and Special Tools
Prepare a safe, solid stand of heavy
Automotive maintenance and repair shop
wooden blocks or a suitable metal stand
equipment: organizational maintenance,
on which to set the powerplant after
common no. 2 (less power) (item 81,
removal. Place the stand on a level 8 x
10-ft (2 x 3-m) area near the vehicle.
q Breaking bar (3/4 in. sq dr)
Socket (1-1/2 in.)
Ensure there is enough head and side
q Torque wrench (0 to 600 ft-lb)
room around the vehicle to work the
q Wrecking bar
hoisting equipment. The hoisting
equipment must have at least a 5.0-ton
5-ton hoist
(4.5-metric ton) rating, a 9.0-ft (2.7-m)
Powerplant lifting sling (item 26, appx G)
reach, and a 10.0-ft (3.0-m) lift.
Plier wire twister (item 30, appx G)
Materials/Parts
General Safety Instructions
Cotter pin (2)
Dry cleaning solvent (item 16, appx C)
Gasket (3)
Vehicle has no brakes when
Lockwasher(12)
Lockwasher
powerplant is disconnected. Failure
Lockwasher (3)
to securely block front and rear vehi-
Lockwasher (18)
cle tracks could cause injury to
Lockwasher (4)
personnel or damage to vehicle or
Lockwire (item 23, appx C)
other equipment if vehicle is free to
Lockwire (item 26, appx C)
roll out of control.
Preformed packing (4)
Seal (2)
Self-locking nut
Personnel Required
Three
References
TM 9-2350-238-24P-1
2-384
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |