|
|
TM 9-2350-238-20-1
2-8. GENERAL PROCEDURES (CONT).
d. Supplies. Be sure all parts and supplies
are on hand.
Stage 3- Surface condition is similar to stage 2
e. Tools. Be sure all common tools are on
except that metal in the corroded
hand.
area is unsound and pin holes may
be present.
2-10. TOOLS AND SUPPLIES. The follow-
Stage 4- No metal remaining at point of sever-
ing list identifies common tools, special tools,
est corrosion. Corrosion holes in the
and supplies needed to perform PMCS on the
area or metal completely worn away.
M578 Recovery Vehicle.
Stage 1 & 2- Areas are to be cleaned, primed,
Tools.
a.
and painted IAW TB 43-0213.
Shop equipment automotive mainte-
Stage 3 & 4- Try to repair metal. If not eco-
nance and repair: organizational
nomical or repairable, replace with
maintenance, common no. 1 (less
new parts.
power) (item 80, appx B)
Sprocket wear gage (item 7, appx G)
d. Modification Work Order (MWO) Applica-
tion. Check the list of current MWOs in DA
b.
Supplies.
PAM 25-30. Do not make any modifications
except as ordered by official Army directive.
Baking soda (item 7, appx C)
Cleaner, lubricant, and preservative
(CLP) (item 8, appx C)
2 - 9 . SPECIAL PROCEDURES F O R
Cloth, crocus (item 10, appx C)
SEMIANNUAL (2400 KILOMETER) PRE-
Dry cleaning solvent (SD2) (item 16,
VENTIVE MAINTENANCE. Semiannual
preventive maintenance includes complete in-
Grease, automotive and artillery (GAA)
spection to make sure adjustment, securing,
(item 20, appx C)
and assembly of all parts of vehicle are right.
Oil, lubricating (OE/HDO) (item 28, appx
All cleaning, replacement, lubrication, and pro-
tection of parts and/or assemblies must be
Oil, lubricating (OEA) (item 29 appx c)
done as stated for trouble-free operation until
Paper, lens (item 30, appx C)
the next preventive maintenance is performed.
Rag, wiping (item 33, appx C)
Maintenance Forms and Records. Refer
c. Mandatory Replacement Parts The
to DA PAM 738-750.
following table reflects the mandatory replace-
ment parts that must be replaced during- PMCS
b. Publications. Be sure all needed publi-
whether they have failed or not.
cations are on hand before starting task.
c. Special Tools. Be sure all special tools
are on hand.
2-16
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |