|
|
TM 9-2330-202-14&P
Table 2-1. OPERATOR/CREW PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS)
FOR THE M101 AND M116 SERIES TRAILERS (continued)
Item
Item to be
Not Fully Mission
No.
Interval
inspected
Procedure
Capable If:
11
During
Stoplight-
NOTE
Taillights
An assistant is required while check-
ing stoplight-taillights.
a. Connect intervehicular cable to
towing vehicle (para 2-13).
b. Operate towing vehicle light switch
through all settings and check stoplight-
taillights.
12
During
Trailer
a. Be alert for any unusual noise while
Operation
towing trailer. Stop and investigate any
unusual noises.
b. Make sure trailer is tracking correctly
behind towing vehicle, with no side pull.
13
Weekly
Wheel and Tire
Check for proper tire pressure when tires One tire is flat, missing,
Assembly
are cool (para 1-15).
or unserviceable.
14
Weekly
On cargo trailers, check for damage and
presence of reflectors.
15
Monthly
Frame
When trailer is loaded, inspect entire
Frame is broken or cracked.
Chassis frame (1) for damage, cracks,
and broken welds.
2-10
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |