Click here to make tpub.com your Home Page

Page Title: OPERATION OF ARCTIC WINTERIZATION KIT
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-386-10
2-43. OPERATION OF ARCTIC WINTERIZATION KIT
a. General. The arctic winterization kit is installed to permit continued opera-
tion of vehicles in temperatures -25F (-32C) or less. The kit includes a hardtop clo-
sure, fuel burning personnel heater, power plant heater, swingfire heater, radiator
cover, and thermal barrier.
b. Special Arctic Winterization Kits. All ESP vehicles may be equipped with
one of two types of special arctic winterization kits:
(1) Multifuel Heater Arctic Winterization Kit Includes the arctic win-
terization kit listed above as well as the cargo body arctic kit. All heaters draw fuel
from vehicle fuel tank.
(2) Swingfire Heater Arctic Winterization Kit Includes the arctic win-
terization kit as well as the cargo body arctic kit. Fuel burning personnel heater
draws fuel from vehicle fuel tank. Power plant heater and cargo body heater are
powered by swingfire heater (refer to para. 2-48) which has its own fuel tank and
may use only gasoline.
c. Hardtop Closure. Refer to para. 2-4.
d. Operation of Fuel Burning Personnel Heater and Power Plant
Heater.
NOTE
This procedure covers multifuel heater operation only. For cover-
age of systems equipped with swingfire heater, refer to para. 2-48.
(1) General. Fuel burning personnel heater provides heat to warm vehicle
cab and defrost windshield while engine is running. Power plant heater preheats
engine coolant, engine, and batteries in preparation for starting in extreme cold or
to maintain engine in standby readiness. Since operating procedures for these
heaters are similar, they will be explained together.
CAUTION
Do not operate fuel burning personnel heater and power plant
heater at the same time. Doing so may result in overworked elec-
tric fuel pump.
NOTE
Refer to para. 2-4 for location and function of heater controls and
indicators.
(2) Open personnel heater shutoff valve, or power plant heater shutoff valve
as necessary by turning counterclockwise.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business