2320-01-318-9902 EIC:B5C, VOLUME NO. 2">

 

Click here to make tpub.com your Home Page

Page Title: Follow-On Maintenance
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-360-20-2
19-6. ARCTIC KIT COOLANT PUMP REPLACEMENT (CONT)
(10) Install two clips (19 and 20) on standoff
bracket (4) with screw (21) and new
locknut (22).
(11) Connect wire no. 1435 (23) and wire no.
1373 (24) to coolant pump (2) with two
new lockwashers (25) and nuts (26).
c. Follow-On Maintenance
(1)
Connect arctic kit batteries (para 19-2).
(2)
Connect HET Tractor batteries (para 7-61).
(3)
Fill cooling system (para 6-2).
(4)
Operate coolant pump and check for leaks (TM 9-2320-360-10).
19-26

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business