2320-01-318-9902 EIC:B5C, VOLUME NO. 2">

 

Click here to make tpub.com your Home Page

Page Title: WINCH CABLE HOLD DOWN VALVE REPLACEMENT
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-360-20-2
17-7. WINCH CABLE HOLD DOWN VALVE REPLACEMENT
This task covers:
a. Removal
c. Follow-On Maintenance
b. Installation
INITIAL SETUP
Equipment Conditions
Materials/Parts
Winch control console front panel
Compound, Sealing, Pipe Thread (Item 15,
removed (para 17-8).
Air system drained (TM 9-2320-360-10).
Tags, Identification (Item 32, Appendix C)
Tools and Special Tools
Tool Kit, Genl Mech (Item 54, Appendix F)
a. Removal
NOTE
Tag  and
mark  air
lines
before
removal.
(1) Remove air line (1) from elbow (2).
(2) Remove air line (3) from elbow (4).
(3) Remove air line (5) from fitting (6).
NOTE
Valve
must
be
turned
counterclockwise while removing to
route lever through slot in winch
console.
(4) Remove two screws (7) and valve (8) from
winch console (9).
(5) Remove elbow (2), elbow (4), and fitting
(6) from valve (8).
17-13

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business