2320-01-318-9902 EIC:B5C, VOLUME NO. 2">
|
|
TM 9-2320-360-20-2
13-8. TEE GEAR BOX REPLACEMENT
This task covers:
a. Removal
c.
Follow-On Maintenance
b. Installation
INITIAL SETUP
Equipment Conditions
Materials/Parts
Air cleaner assembly and bracket removed
Locknuts (4) (Item 61, Appendix G)
Locknuts (3) (Item 56, Appendix G)
Inner fender removed (left side only)
Lockwashers (4) (Item 102, Appendix G)
Personnel Required
Two
Tools and Special Tools
Tool Kit, Genl Mech (Item 54, Appendix F)
Wrench, Torque, 0-175 Lb-Ft (Item 73,
NOTE
Do not move HET Tractor wheels
during tee gear box replacement. If
wheels are moved, notify direct
support to do steering timing
procedure (TM 9-2320-360-34).
a. Removal
(1) Deleted.
(2) Remove locknut (7) and screw (8) from
lower yoke (9) of top steering shaft (10).
Discard locknut.
(3) Remove yoke (9) from tee gear box shaft
(11).
Change 1 13-35
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |