2320-01-318-9902 EIC:B5C, VOLUME NO. 2">

 

Click here to make tpub.com your Home Page

Page Title: AIR GOVERNOR TESTING/ADJUSTMENT
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-360-20-2
11-30. AIR GOVERNOR TESTING/ADJUSTMENT
This task covers:
a. Testing
c. Follow-On Maintenance
b. Adjustment
INITIAL SETUP
Equipment Conditions
Tools and Special Tools
Air system drained (TM 9-2320-360-10).
Tool Kit, Genl Mech (Item 54, Appendix F)
Lower engine access panel removed
a. Testing
(1) Start engine (TM 9-2320-360-10).
(2) Watch air pressure gage (1). Green and
red needles (2) should move up scale as
pressure builds up.
NOTE
When governor cuts out, released air
from air dryer can be heard.
(3) After several minutes, gage needles (2)
should stop at 120-125 psi (827-862 kPa)
as governor cuts out.
(4) Adjust governor (3) if it does not cut out at
120-125 psi (827-862 kPa).
11-117

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business