2320-01-318-9902 EIC:B5C, VOLUME NO. 2">
|
|
TM 9-2320-360-20-2
11-24. PURGE TANK AND VALVE REPAIR
This task covers:
a. Removal
d. Installation
b. Disassembly
e. Follow-On Maintenance
c. Assembly
INITIAL SETUP
Equipment Conditions
Materials/Parts
Muffler removed (para 5-3).
Compound, Sealing, Pipe Thread (Item 15,
Air system drained (TM 9-2320-360-10).
Locknuts (8) (Item 58, Appendix G)
Locknuts (2) (Item 72, Appendix G)
Tools and Special Tools
Tool Kit, Genl Mech (Item 54, Appendix F)
a. Removal
(1)
Remove hose no. 2994 (1) from elbow (2).
(2)
Remove locknut (3), standoff bracket (4), screw
(5), and standoff bracket (5.1) from clamp (9).
Discard locknut.
(3)
Remove locknut (6) and screw (8) from clamp
(9.1). Discard locknut.
NOTE
Purge tank is removed by sliding
forward out of rear support bracket,
then up and out of frame.
(4)
Remove purge tank (10) from frame (11).
11-93
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |