2320-01-318-9902 EIC:B5C, VOLUME NO. 2">
|
|
TM 9-2320-360-20-2
5-3. MUFFLER REPLACEMENT
This task covers
a. Removal
c. Follow-On Maintenance
b. Installation
Initial Setup:
Equipment Conditions
Materials/Parts
Exhaust pipe removed (para 5-2).
Clamps (4) (Item 16, Appendix G)
Locknuts (8) (Item 68, Appendix G)
Locknuts (4) (Item 58, Appendix G)
Tools and Special Tools
Tool Kit, Genl Mech (Item 54, Appendix F)
Locknuts (4) (Item 65, Appendix G)
Wrench, Torque, 0-75 Lb-In. (Item 71,
Lockwashers (2) (Item 104, Appendix G)
Personnel Required
Two
a. Removal
WARNING
cool before performing maintenance.
Failure to comply may result in
serious personal Injury.
(1) Remove four locknuts (1) from screws (2).
Discard locknuts.
(2) Remove four screws (2) and step (3) from step
mounting brackets (4).
5-5
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |