2320-01-318-9902 EIC:B5C, VOLUME NO. 2">
|
|
TM 9-2320-360-20-2
6-6. COOLING SYSTEM HOSE REPLACEMENT
This task covers:
a. Removal
c. Follow-On Maintenance
b. Installation
INITIAL SETUP
Equipment Conditions
Tools and Special Tools
Cooling system drained (para 6-2).
Tool Kit, Genl Mech (Item 54, Appendix F)
Wrench, Torque, 0-200 Lb-In. (Item 72,
Socket Wrench Set, 3/8 In. Drive (Item 45,
a. Removal
NOTE
Tag and mark hoses before removal.
(1) Loosen four damps (1) on two upper
hoses (2 and 3).
NOTE
Location of plastic cable ties should
be marked before removal.
(2) Remove plastic cable ties (4) from hose
(3) and wire harness (5).
(3) Remove upper hoses (2 and 3) from
radiator (6) and thermostat covers (7 and
8).
(4) Loosen two clamps (9) on radiator vent
hose (10).
(5) Remove radiator vent hose (10) from
fittings (11 and 12).
6-34 Change 1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |