|
|
TM 9-2320-285-24-2
4-4. TRANSMISSION (CONT)
c. Forward Clutch and Shaft Assembly (cont).
STEP
LOCATION
ITEM
ACTION
REMARKS
REASSEMBLY (cont)
10
Forward
Clearance between
Measure
Hold hub (10) up against
clutch
hub (10) and top
internal snap ring (9), as
clearance
forward clutch
shown. Insert forward
check
disc (15)
clutch gage. When correct
clearance is achieved, first
step of forward clutch gage
will fit, second step will
not. If clearance is exces-
sive, replace parts in fol-
lowing order to achieve
correct clearance: 1) Any or
all of forward clutch plates
(16); 2) Hub (10). If clear-
ance is still excessive,
install thicker forward
clutch piston (21). If
clearance is insufficient,
install thinner forward
clutch piston (21). After
installing any part, recheck
clearance
NOTE
Parts removed in steps 11a through 11c below should be saved for reinstallation.
11
Turbine
a. Internal snap
Remove
shaft and
ring (9)
clutch
b. Hub (10)
Remove
housing
c. 10 forward
Remove
(17)
clutch discs
and plates
(15 and 16)
4-47
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |