Click here to make tpub.com your Home Page

Page Title: REASSEMBLY (cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-285-24-2
3-42.
FIFTH WHEEL HYDRAULIC SYSTEM MAINTENANCE (CONT)
b. Power Take-off (cont).
STEP
LOCATION
ITEM
ACTION
REMARKS
REASSEMBLY (cont)
20
k.
Idler shaft (41)
Install
Until flush with housing (37)
(cont)
l.
Setscrew (40)
Install
m.
Pipe plug (39)
Install
n.
Retaining ring
Install
In housing (68)
(48) and
socket head
screw (29)
21
Cover
a.
Spring (38),
Install
(23)
poppet (37),
and new
O-ring (36)
b.
Shifter plate
Install
(35)
c.
Washer (34)
Install
d.
Shift lever (33)
Install
e.
Washer (32) and
Install
capscrew (31)
INSTALLATION
NOTE
Gasket (30) thickness must be selected to provide 0.005 to 0.025 inch backlash between input gear (45)
and transmission PTO drive gear.
22
Transmis-
a.
New gasket (30)
Install
On power take-off
sion, right
b.
Power take-off
Position
On transmission
hand side
c.
Copper gasket
Install
Tighten capscrew to
(28) and
33 pounds foot torque
capscrew (27)
d.
Four copper
Install
gaskets (26)
and nuts (25)
e.
Socket head Tighten
screw (29)
3-431

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business