|
|
TM 9-2320-285-24-2
3-5. COOLING SYSTEM MAINTENANCE (CONT)
b. Fan Shroud (cont).
STEP
LOCATION
ITEM
ACTION
REMARKS
INSTALLATION (cont)
6
Engine,
Fan and drive
Install
Para 2-15d
front
belts
7
Frame,
Right hand radia-
Install
right side
tor strut
8
Engine,
Radiator hoses
Install
Para 2-15c
front
9
Radiator,
Coolant overflow
Install
Para 2-15f
top rear
system kit
10
Air cleaner
Precleaner
Install
Para 2-13a
11
Front of
Radiator
Fill
With coolant (para 2-15a(1))
vehicle
12
Cab tilt
Cab Lower
To normal operating position
pump
NOTE
Operate vehicle and check for leaks; correct as necessary.
3-25
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |