|
|
TM 9-2320-285-24-1
2-87.
PRESSURE GAGES MAINTENANCE
c.
FUEL Gage.
This task covers:
a. Removal
c. Inspection
b. Cleaning
d. Installation
INITIAL SETUP
Tools
Equipment Condition
No. 1 Common Organizational Maintenance
Paragraph Condition Description
Combination wrench set
Vehicle parked on level
Socket wrench set
surface, engine off, and
Safety glasses
parking brake applied.
2-34a
Battery ground cable
Materials/Parts
disconnected.
Cleaning solvent
Item 1,
Appendix C
2-26g(1)
Instrument panel raised.
Clean cloths
Item 2,
Appendix C
2-26d(1)
Gage light socket with bulb
Fine sandpaper
Item 4,
Appendix C
removed.
Tags
Item 14,
Appendix C
2-26b(3)
Electrical leads disconnected
from fuel gage.
Personnel Required
Wheel Vehicle Mechanic MOS 63B
2-929
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |