|
|
TM 9-2320-285-24-1
2-63. FRAME AND TOWING ATTACHMENTS MAINTENANCE (CONT)
e.
Boom Platform and Latch Assembly (cont).
STEP
LOCATION
ITEM
ACTION
REMARKS
INSPECTION (cont)
5
c.
Cotter pins (5)
Inspect for:
Replace if necessary
(cont)
and washers
deformation
(6)
cracks
d. Shafts (7)
Inspect for:
Replace if necessary
cracks
wear
deformation
e. Latches (8)
Inspect for:
Replace if necessary
cracks
breaks
damage
f.
Boom tie
Inspect
For deformed or damaged
plate
threads at pivot brackets
(11) mounting holes. Repair
using 10-24 tap
INSTALLATION
6
Boom tie
a. Two pivot
Position
Over mounting holes
plate
brackets (11)
b. Four lock wash-
Install
ers (10) and
screws (9)
c. Two latches (8)
Position
Between ears of pivot
brackets (11)
d. Two shafts (7)
Install
Through pivot brackets (11)
ears and latches (8)
e. Two washers (6)
Install
f. Two cotter
Install
On shaft (7)
pins (5)
7
Boom
a. Two latch
Position
Over mounting holes
platform
brackets (4)
(1)
b. Four screws (2)
Install
and locknuts
(3)
8
Boom
a. Boom platform
Install
Insert front under lip of
assembly,
(1)
boom platform hold bracket,
rear
and lower back of platform
into position
b. Two latches (8)
Pull up and
over latch
bracket (4)
to secure
2-694
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |