Click here to make tpub.com your Home Page

Page Title: INSTALLATION (cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-285-24-1
2-30. 24V INVERTER MAINTENANCE (CONT)
STEP
LOCATION
ITEM
ACTION
REMARKS
INSTALLATION (cont)
10
e. Six nuts (8)
Install and
Secures electrical leads to
(cont)
and lock
tighten
input side of circuit
washers (9)
breakers
f. 15 electrical
Connect
To output (remaining) side of
leads
circuit breakers as tagged
g. Six nuts (10)
Install and
Secures electrical leads to
and lock
tighten
output side of circuit
washers (11)
breakers (12)
11
Inverter
a. Inverter (7)
Position
On four mounting studs
(7)
b. White electri-
Connect
Over inverter mounting stud
cal lead
c. Four nuts (5)
Install and
Secures inverter (7) and
and lock
tighten
white electrical lead
washers (6)
d. Nine electrical
Connect
To inverter (7) terminal
leads
strip as tagged
e. Nine screws (4)
Install and
Secures electrical leads to
tighten
inverter (7) terminal strip
12
Cables,
Clamps and tie
Install
At locations noted during
wires, and
straps
removal
harness
13
Cab tilt
Tractor cab
Lower
To normal operating position
pump
14
Battery
Battery ground
Connect
box
cable
15
Tractor
Brake, parking,
Check
For proper operation in
cab
turn signal, and
tractor, 12-volt trailer,
clearance lights
and 24-volt trailer
2-315

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business