|
|
TM 9-2320-285-24-1
2-30. 24V INVERTER MAINTENANCE (CONT)
STEP
LOCATION
ITEM
ACTION
REMARKS
REMOVAL (cont)
3
b. Six nuts (8)
Remove
From circuit breakers (12)
(cont)
and lock
washers (9)
c. Lights wiring
Disconnect
From circuit breakers (12)
harness elec-
trical leads
d. 15 electrical
Tag
Tag 15 remaining electrical
leads
leads connected to circuit
breakers (12)
e. Six nuts (10)
Remove
From circuit breakers (12)
and lock
washers (11)
f. 15 electrical
Disconnect
From circuit breakers (12)
leads
g. Six circuit
Remove
Snap out from bracket (14)
breakers (12)
h. Two locknuts
Remove, if
Support bracket (14)
(13)
necessary
i. Bracket (14)
Remove
From mounting studs
NOTE
Remove all clamps and tie straps as necessary for cable or wire removal in the following steps. Note
locations to aid installation.
4
Rear hood
a. Electrical tape
Remove
From boot (16) and 7-wire
enclosure
cable (29)
b. Boot (16)
Slide back
Onto 7-wire cable (29) so
screws (15) are accessible
c. Seven electri-
Tag
Tag 7-wire cable (29) leads
cal leads
at 12-volt receptacle (20)
d. Seven screws
Remove
(15)
e. 7-wire cable
Disconnect
From 12-volt receptacle (20)
(29) leads
f. Boot (16)
Remove
Pull from 7-wire cable (29)
g. Two nuts (17),
Remove
Support 12-volt receptacle
lock washers
(20)
(18), and
capscrews
(19)
h. 12-volt recep-
Remove
tacle (20)
i. Screw (21) and
Remove
If necessary for removal of
washer (22)
7-wire cable (29 or 32)
2-309
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |