Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-285-24-1
2-26. INSTRUMENT PANEL MAINTENANCE (CONT)
e.
Ammeter and 40A Circuit Breaker (cont).
STEP
LOCATION
ITEM
ACTION
REMARKS
INSTALLATION
6
Instrument
Ammeter (15)
Install
panel, top
7
Cab tilt
Cab
Tilt 45
pump
degrees
8
Instrument
a. Mounting clamp
Position
On ammeter mounting studs
panel,
(14)
underside
b. Two washers
Install and
(13) and nuts
tighten
(12)
c.  Three electri-
Connect
To circuit breaker (7)
cal leads
battery terminal, as tagged
(11) and
electrical
lead (4)
d. Electrical lead Connect
To remaining circuit breaker
(10)
terminal, as tagged
e. Two lock wash-
Install and
ers (9) and
tighten
nuts (8)
f.  Circuit breaker
Position
On ammeter mounting stud
(7)
g. Lock washer (6)
Install and
and nut (5)
tighten
h. Electrical lead
Connect
To ammeter (15) "-" terminal,
(3)
as tagged
i.  Electrical lead Connect
To ammeter (15) "+" terminal,
(4)
as tagged
j.  Two lock wash-
Install and
ers (2) and
tighten
nuts (1)
k.  Ammeter socket
Install
and bulb
9
Cab tilt
Cab
Lower
To normal operating position
pump
10
Battery
Battery ground
Connect
box
cable
2-272

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business