| 
 | ||||||||||
| 
 |  TM 9-2320-285-24-1 2-25. STARTING SYSTEM MAINTENANCE (CONT) a. Solenoid and 70 AMP Circuit Breaker (cont). STEP LOCATION ITEM ACTION REMARKS INSTALLATION (cont) 4 g. Terminal (19) Connect To circuit breaker (40) (cont) and red wire (15) h. Lock washer Install and Secures terminal (19) (18) and tighten screw (17) i.  Plate (33) Position On starter j.  Two capscrews Install and Secures plate (33) (32) tighten k.  Solenoid (31) Support l.  Terminal (26) Connect To solenoid (31) and black wire (8) m. Washer (25) Install and and nut (24) tighten n. Tan/green wire Connect To solenoid (31) (30) o. Lock washer (29) Install and and nut (28) tighten p. Terminal (22) Connect To solenoid (31) and black wire (23) q. Washer (21) and Install and nut (20) tighten r.  Terminal (16) Connect To solenoid (31) and red wire (11) s.  Terminal (14) Connect To solenoid (31) and red wire (15) t.  Washer (13) Install and and nut (12)tighten u. Terminal (4) Install Tighten to 13-17 pounds foot and capscrew (43) v.  Shield (3) Position w. Two capscrews Install Connect terminal (4) of black (2) and nuts and tighten wire (23) to one capscrew (1) x.  Terminal (7) Connect To starter solenoid and black wire (8) y.  Lock washer (6) Install and and nut (5) tighten 2-207 | 
| Privacy Statement - Press Release - Copyright Information. - Contact Us |