|
|
TM 9-2320-270-20-3
DEFROSTER NOZZLE
This task covers:
a. Removal (page 4-1289)
b. Installation (page 4-1290)
INITIAL SETUP
Tools
Materials/Parts
Pliers, diagonal-cutting
Wrap, tie (item 24, appendix C)
Pliers, slip-joint, straight-nose
Screwdriver, cross-tip, number 1
Personnel Required
One
ACTION
LOCATION
ITEM
REMARKS
REMOVAL
NOTE
Steps in this task are the same for right and left defroster nozzles.
1. C a b
Instrument panel
Open (page 4-244).
2. Hose (1) to
Tie wrap (3)
a. Using cutting pliers, cut and take off.
nozzle (2)
b. Get rid of.
3. Nozzle (2)
Hose (1)
Pull off.
4. Dashboard (4)
TWO screws (5),
a. Using cross-tip screwdriver, unscrew
Iockwashers (6),
and take off.
and nozzle (2)
b. Get rid of Iockwashers (6).
TA24O81O
4-1289
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |