|
|
TM9-2320-270-20-3
FLOOR MAT
This task covers:
c. Installation (page 4-1134)
a. Removal (page 4-1134)
b. Cleaning/Inspection (page 4-1134)
INITIAL SETUP
Equipment Condition
Tools
Brake pedal and treadle valve removed
Screwdriver, cross-tip, number 3
(page 4-720).
Accelerator pedal removed (page 4-126).
Personnel Required
Retarder pedal removed (page 4-547).
Shift control removed (page 4-526).
One
Shift control housing removed (page 4-536).
ACTION
REMARKS
ITEM
LOCATION
REMOVAL
Using screwdriver, unscrew and take out.
10 screws (3)
1. Two plates (1) to
cab (2)
Take off.
Two plates (1)
2. Cab (2)
and floor mat (4)
CLEANING/inspection
Clean and inspect as shown in the general
Ail parts
3.
maintenance instructions (page 4-1).
installation
Place in position.
Floor mat (4) and
4. Cab (2)
two plates (1)
Screw in and tighten using screwdriver.
10 screws (4)
5. Two plates (1)
to cab (2)
4-1134
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |