|
|
TM 9-2320-270-20-2
AIR DISTRIBUTION MANIFOLD - CONTINUED
INSTALLATION CONTINUED
NOTE
FOLLOW-ON MAINTENANCE: Check for leaks (page 4-1).
TASK ENDS HERE
TOWING KIT CHECK VALVE
This task covers:
d. Inspection/Replacement (page 4-827)
a. Removal (page 4-826)
e. Assembly (page 4-828)
b. Disassembly (page 4-827)
f. Installation (page 4-828)
c. Cleaning (page 4-827)
INITIAL SETUP
Materials/Parts
Tools
Soap, liquid (item 14, appendix C)
Hammer, plastic
Tape, teflon (item 22, appendix C)
Pliers, long-nose, round
Vise
Personnel Required
Wrench, open-end, 5/8-inch
Wrench, open-end, 7/8-inch
One
Wrench, open-end, 1 1/16-inch
Wrench, open-end, 1 3/8-inch
ACTION
ITEM
REMARKS
LOCATION
REMOVAL
WARNING
Make sure all pressure is drained from air system before disconnecting air lines. Parts
under pressure can, when removed, fly off with great force causing injury to personnel.
Drain (TM 9-2320-270-20).
Air system
1.
Using 5/8-inch wrench, unscrew and pull
Nut (3)
2. Air line 654 (1)
back.
to elbow (2)
Pull out.
Air line 654 (1)
3. Elbow (2)
4-826
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |