|
|
TM 9-2320-270-20-2
AIR DISTRIBUTION MANIFOLD
This task covers:
a. Removal (page 4-818)
d. Inspection/Replacement (page 4-822)
b. Disassembly (page 4-820)
e. Assembly (page 4-822)
c. Cleaning (page 4-822)
f. Installation (page 4-824)
INITIAL SETUP
Tools
Tools Continued
Handle, ratchet, 3/8-inch drive
Wrench, open-end, 1 3/8-inch
Hammer, plastic
Wrench, pipe, 1/4- to l-inch
Pliers, diagonal-cutting
Pliers, long-nose, round
Materials/Parts
Pliers, slip-joint, straight-nose
Socket, 7/16-inch, 3/8-inch drive
Lockwasher, manifold to frame (two required)
Vise
Soap, liquid (item 14, appendix C)
Wrench, box, 7/16-inch
Tag, marking (item 18, appendix C)
Wrench, open-end, 5/8-inch
Tape, teflon (item 22, appendix C)
Wrench, open-end, 13/16-inch
Wrap, tie (item 24, appendix C)
Wrench, open-end, 7/8-inch
Wrench, open-end, 15/16-inch
Personnel Required
One
4-817
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |