|
|
TM9-2320-270-20-2
SPRING BRAKE VALVE
This task covers:
d. Inspection/Replacement (page 4-808)
a. Removal (page 4-806)
e. Assembly (page 4-808)
b. Disassembly (page 4-808)
f. Installation (page 4-810)
c. Cleaning (page 4-808)
INITIAL SETUP
Materials/Parts
Tools
Lockwasher, spring brake valve to frame
Extension, 6-inch, 1/2-inch drive
(two required)
Hammer, plastic
Soap, liquid (item 14, appendix C)
Handle, ratchet, 1/2-inch drive
Tag, marking (item 18, appendix C)
Pliers, long-nose, round
Tape, teflon (item 22, appendix C)
Socket, 1/2-inch, 1/2-inch drive
Vise
Personnel Required
Wrench, box, 1/2-inch
Wrench, open-end, 9/16-inch
One
Wrench j open-end, 5/8-inch
Wrench, open-end, 1 1/16-inch
Wrench, open-end, 3/4-inch
ACTION
REMARKS
ITEM
LOCATION
REMOVAL
WARNING
Make sure all pressure is drained from air system before disconnecting air lines. Parts
under pressure can, when removed, fly off with great force causing injury to personnel.
NOTE
Tag air lines according to general maintenance instructions (page 4-1).
Drain (TM 9-2320-270-10).
Air system
1.
Using 5/8-inch wrench, unscrew and pull
Nut (3)
2. Air line 621 (1) to
back.
elbow (2)
Pull out.
Air line 621 (1)
3. Elbow (2)
Using 5/8-inch wrench, unscrew and pull
Nut (6)
4. Air line 622 (4) to
back.
elbow (5)
Pull out.
Air line 622 (4)
5. Elbow (5)
4-806
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |