Click here to make tpub.com your Home Page

Page Title: REMOVAL
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM9-2320-270-20-2
PRIMARY AIR RESERVOIR CHECK VALVE - CONTINUED
ACTION
REMARKS
ITEM
LOCATION
REMOVAL
WARNING
Make sure all pressure is drained from air system before disconnecting air lines. Parts
under pressure can, when removed, fly off with great force causing injury to personnel.
Drain (TM 9-2320-270-10).
Air system
1.
Using 1 1/8-inch wrench, unscrew and
Air line 615 (2)
2. Elbow (1)
pull back.
Using long-nose pliers, pull out.
Insert (3)
3. Elbow (1) or air
line 615 (2)
Using 1 3/8-inch and 1 1/16-inch
Elbow (1)
4. Check valve (4)
wrenches, unscrew and take out.
Using 1 1/16-inch and 1 3/8-inch
Check valve (4)
5. Adapter (5)
wrenches, unscrew and take out.
CLEANING
Clean according to general maintenance
All parts
6.
instructions (page 4-1).
lNSPECTION/REPLACEMENT
Inspect according to general maintenance
All parts
7.
instructions (page 4-1).
INSTALLATION
a. Wrap threads with teflon tape
Check valve (4)
8. Adapter (5)
(page 4-1).
b. Screw in and tighten using 1 3/8-inch
wrench.
4-708

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business