Click here to make tpub.com your Home Page

Page Title: FRONT AXLE AIRBRAKE CHAMBERS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM9-2320-270-20-2
SECONDARY AIR RESERVOIR - CONTINUED
NOTE
FOLLOW-ON MAINTENANCE: Check for leaks (page 4-1).
TASK ENDS HERE
FRONT AXLE AIRBRAKE CHAMBERS
This task covers:
c. Inspection/Replacement (page 4-689)
a. Removal/Disassembly (page 4-686)
d. Assembly/installation (page 4-689)
b. Cleaning (page 4-688)
.
INITIAL SETUP
Materials/Parts
Tools
Cement, rubber (item 3, appendix C)
Chisel, cold hand, 1/2-inch
Rags, wiping (item 10, appendix C)
Hammer, machinist's ball-peen,
Sandpaper, medium grit (item 13, appendix C)
1-pound
Tape, teflon (item 22, appendix C)
Handle, ratchet, 3/8-inch drive
Screwdriver, flat-tip, 5/8-inch
Personnel Required
Socket, 3/8-inch, 3/8-inch drive,
12 point
Two
Vise
Wrench, box, 1/2-inch
Wrench, box, 9/16-inch
Wrench, box, 3/4-inch
Wrench, open-end, 7/8-inch
Wrench, pipe, 1/4- to 1-inch
ACTION
REMARKS
ITEM
LOCATION
REMOVAL/DISASSEMBLY
WARNING
Make sure all pressure is drained from air system before disconnecting air lines. Parts
under pressure can, when removed, fly off with great force causing injury to personnel.
4-686

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business