|
|
TM 9-2320-270-20-1
SECONDARY AIR SYSTEM LOW PRESSURE SWITCH
This task covers:
c. Installation (page 4-403)
a. Removal (page 4-402)
b. Cleaning/Inspection (page 4-402)
INITIAL SETUP
Personnel Required
Tools
One
Brush, wire
Screwdriver, flat-tip, 3/6-inch
Equipment Condition
Wrench, open-end, 1 1/16-inch
Air pressure drained (TM 9-2320-270-10).
Materials/Parts
instrument panel open (page 4-244).
Tape, teflon (item 22, appendix C)
ACTION
REMARKS
ITEM
LOCATION
REMOVAL
WARNING
Make sure all pressure is drained from air system before taking off switch. Parts under
pressure can, when removed, fly off with great force causing injury to personnel.
UnpLug.
Wire 120 (2)
1. Secondary system low
pressure switch (1)
Using 1 1/16-inch wrench, unscrew and
Low pressure
2. Tee (3)
take out.
switch (1)
CLEANING/lNSPECTION
a. Using wire brush, clean all old sealer
Low pressure
3.
from threads.
switch (1)
b. Inspect for stripped or damaged
threads.
If threads are stripped or damaged,
replace.
Tee (3)
inspect for stripped or damaged threads.
4.
If threads are stripped or damagad,
replace.
4-402
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |