|
|
TM 9-2320-270-20-1
LIGHT SWITCH - CONTINUED
NOTE
FOLLOW-ON MAINTENANCE:
1. Connect battery ground cable (page 4-444).
2. Check operation (TM 9-2320-270-10).
3. Close instrument panel (page 4-244).
TASK ENDS HERE
CLEARANCE LIGHT SWITCH
This task covers:
a. Removal (page 4-292)
b. Installation (page 4-292)
INITIAL SETUP
Personnel Required
Tools
One
Screwdriver, flat-tip, 1/4-inch
Screwdriver, flat-tip, 3/8-inch
Equipment Condition
Wrench, box, 9/18-inch
Battery ground cable disconnected
Materials/Parts
Instrument panel open (page 4-244).
Lockwasher, terminal screw
(two required)
Tag, marking (item 18, appendix C)
4-291
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |