Click here to make tpub.com your Home Page

Page Title: INSTALLATION CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-270-20-1
FUEL RETURN LINES AND FITTINGS - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
57. Elbow (10) and
Reducer (12)
Screw on and tighten using 7/8-inch
tube (11)
wrench and pipe wrench.
58. Right fuel tank (13)
Reducer (12), elbow
Screw in and tighten using 7/18-inch
(10), and tube (11)
wrench.
59. Elbow (10)
Hose (2)
Screw on and tighten using 3/4-inch
wrench.
NOTE
FOLLOW-ON MAINTENANCE:
1.
Install shutdown solenoid (page 4-422).
2.
Install right side radiator guard (page 4-151).
3.
Check for leaks (page 4-1).
4.
Install right side panel and close right side of hood (TM 9-2320-270-10).
TASK ENDS HERE
TA239874
4-109

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business