|
|
TM9-2320-270-20-1
TROUBLESHOOTING - CONTINUED
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
Step 13.
Open left side of hood (TM 9-2320-270-10). Using multimeter set at 30 vdc,
put red probe on solenoid power terminal (4) and black probe on frame (5).
Have assistant turn key to START position, take the reading and have assistant
turn key to OFF position.
If meter reads no voltage, close instrument panel (page 4-244),
install right and left side panels, close left side of hood
(TM 9-2320-270-10), and notify direct support maintenance.
Step 14.
Using multimeter set at RX 1, put red probe on cab (6) and black probe
on frame (5).
If meter does not read zero, close instrument panel (page 4-244),
install right and left side panels, close left side of hood
(TM 9-2320-270-10), and notify direct support maintenance.
3-11
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |