|
|
SECTION IV. PRINCIPLES OF OPERATION
1.
The contents are inventoried and the auger
in the M300 FPE is assembled.
2.
Two bore holes are dug using the auger.
3.
The binary explosive ingredients in each
of the two plastic containers are mixed.
4.
One explosive container is lowered into a
hole and the hole is filled with dirt.
5.
The other explosive container is lowered
into the other hole and the hole is filled
with dirt.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |