TM 9-1300-277
Table 9-2. Conventional Ammunition Demilitarization Facilities and Capabilities (AMCCOM)-Continued
PUEBLO ARMY DEPOT ACTIVITY-Continued
Disassembly
facilities
Washout
furnace
Detonation
Open burning
AWS - 10
Decluster M42 rkt mtr
for DEMIL (Nike Herc)
prepare M30 rkt mtr
and M135 whd for
DEMIL (Nike Herc).
Small arms breakdown.
Small items break-
down.
TV Disassembly Plant
for disassembly of
bombs, large separ-
ate loading shell,
rocket motors, etc.
Bldg AWS - 4
Breakdown of large or
small items.
RED RIVER ARMY DEPOT
Bldg 1163 - 16,280 sq
Bldg 1122 - 3,674 sq
Bldg 1025 & 1027 -
1 detonation site w/4
High explosive burn-
ft.
ft.
2 APE 1236W/KIT E010
electrical firing
ing area 350,000
Bldg 1116 - 15,540 sq
APE 1300 plant with
terminals 6 circuits
sq ft with an ex-
ft.
water reclamation
each.
plosive limit of
Center substantial di-
system. Requires
50,000 lb.
viding wall with op-
operational check-
Detonation restric-
erational bays.
out and charcoal
tion:100 lb above
Smokeless powder burn-
Power conveyor.
filter system.
ground; 3,000 lb
ing area 250,000
Powder collection sys-
below ground.
sq ft with an explo-
tem.
4 aeration lagoons.
sive limit of
Full complement of
8 static firing tanks
60,000 lb.
APE disassembly and
for Hawk Missile
breakdown equipment.
Motors.
Open burning of explo-
sives and propel-
Bldg 1149 -
lants approved by
Disassembly barricade
Texas Air Control
for remote disas-
Board-2 April 80.
sembly of items with
less than 70 lb of
Destruction of chemi-
explosive.
cal ammunition
disapproved.
Change 2 9-10
|