Click here to make tpub.com your Home Page

Page Title: NAVAJO ARMY DEPOT ACTIVITY
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-1300-277
NAVAJO ARMY DEPOT ACTIVITY
Bldg 301-
Three major tank as-
APE 1236 W/KIT
14 detonation sites.
1 burning site.
Partial center dividing
semblies have been
E010 - with Part B EPA
walls with opera-
removed and in-
permit being processed
*Detonation restric-
tional bays.
stalled at Tooele
thru state and federal
tion: 5,000 lb
Power conveyor.
AD. Washout plant
levels.
above ground;
Powder collection system.
is completely in-
10,000 lb below
operable. No cost
ground with 6 feet
Bldg 325-
estimate available.
earth cover.
Small Arms Disassembly
(Inactive)
*The limits indicated were recommended by Utah Study (December 15, 1959). Presently operating with self-imposed limitation of 1000 to 1200 pounds per shot.
PUEBLO ARMY DEPOT ACTIVITY
Bldgs 711-741-
APE 1300 washout and
APE 1236 W/KIT E010
14 detonation pits/
4 burning sites.
Power conveyors.
pelleting system
holes.
Powder collection sys-
and water reclama-
1 burning cage.
tem.
tion system.
Detonation restriction:
APE disassembly and
50 lb maximum above
breakdown equipment.
ground; 4,000 lb to
20,000 lb maximum
Bldgs 701 - 706
below ground per
Small arms breakdown.
pit/hole.
Small items breakdown.
State EPQ requires
Bldg 761
particulate emission
Small arms breakdown
monitoring.
Power conveyors
powder collection
system.
APE disassembly
and breakdown
equipment.
Change 2 9-9

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business