|
|
TM 9-1290-335-34&P
Section 4. FLANGE AND WINDOW
4-9 .FLANGE AND WINDOW MAINTENANCE PROCEDURES INDEX
Task
Reference (para)
Removal
4-10
Installation
4-11
4-10.
FLANGE AND WINDOW REMOVAL
TOOLS:
1/16" drive pin punch
4 oz. ball peen hammer
#0 cross tip screwdriver (Phillips type)
PERSONNEL: One
EQUIPMENT CONDITION: Azimuth indicator on work bench
PRELIMINARY PROCEDURES: Remove dial (para 4-4)
Remove knob (para 4-7)
FRAME 1
Step
Procedure
1.
Press bellows (1) into housing (2), and using punch and hammer, drive out pin (3).
2.
Remove cone (4), flange assembly (5), and window assembly (6) from housing (2).
GO TO FRAME 2
Vol II
Para 4-9
4-7
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |