Click here to make tpub.com your Home Page

Page Title: Final Inspection
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-1290-232-34&P
FINAL
INSPECTION
C l o t h , lint free (item 1, App A)
SUPPLIES:
PERSONNEL:
One
REFERENCES:
JPG
41C
for
cleaning
EQUIPMENT CONDITION: Elevation fire control quadrant on work bench
NOTE
If you do not
If you find a fault, tell your supervisor.
f i n d a fault, send the good elevation fire control quadrant
b a c k to service.
FRAME
1
Procedure
step
1.
Turn
knob
(1)
clockwise
then
counterclockwise.
Knob
(1)
should
move
freely without binding.
2.
Make sure that level vial tube glass (2) is not cracked or broken.
3.
Make sure that level vial tube cover (3) snaps into detent in both open and closed
positions.
4.
Using cloth, clean elevation fire control quadrant (4) (JPG).
END
OF
TASK
II-5-6

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business