|
|
TM 9-1290-232-34&P
Section
6.
HOUSING
HOUSING
MAINTENANCE
PROCEDURES
INDEX
Reference
(para)
Task
Disassembly
Assembly
HOUSING DISASSEMBLY
TOOLS: 3/16", 1/4" flat tip screwdriver
P a r a l l e l action jaw pliers
PERSONNEL:
One
EQUIPMENT CONDITION: Elevation fire control quadrant on work bench
PRELIMINARY PROCEDURES: Remove worm shaft assembly (para 4-13)
NOTE
The worm gear housing (5) and elevating worm housing
(6) are matched assemblies and should remain a set
t h r o u g h o u t disassembly and assembly.
FRAME
1
Procedure
Step
Using 1/4" screwdriver, remove three screws (1) and three lockwashers (2).
1.
2.
Hold quadrant (3) in your hand with cover (4) facing work bench. Gently tap quadrant
(3) on work bench until cover (4) separates from quadrant (3).
NOTE
(5)
and
elevating
worm
Worm
gear
housing
h o u s i n g (6) are close fits and must be separated evenly
a n d carefully to prevent binding.
Carefully and evenly take worm gear housing (5) out of elevating worm housing (6).
3.
4.
Using
3/16"
screwdriver,
remove
two
screws
(7)
and
two
stops
(8).
5.
Using 1/4" screwdriver, remove screw (9), lockwasher (10) and reflector (11). (M13A1,
M13A1C and M13B1 only.)
NOTE
D o step 6 only if pin (12) is damaged.
6.
Using parallel action jaw pliers, remove pin (12).
END
OF
TASK
II-4-28
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |