Click here to make tpub.com your Home Page

Page Title: APPENDIX E REPAIR PARTS AND SPECIAL TOOLS LIST
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-1270-219-13&P
REPAIR
PARTS
AND
SPECIAL
TOOLS
LIST
Section
I.
INTRODUCTION
E-1. Scope.
This
appendix
lists
repair
parts
and
PB
Item
procured
and
stocked
for
s p e c i a l tools required for the operation and performance
purposes because essentiality dictates that a
of
aviation
unit
maintenance,
Aviation
intermediate
minimum
quantity
be
available
in
the
supply
maintenance and Depot maintenance. It authorizes the
systems.
PC
Item
procured
and
stocked
which
otherwise
requisitioning and issue of spares and repair parts as
indicated by the source and maintenance codes.
would be coded PA except that it is deteriorative
in nature.
E-2. General. This repair parts and special tools list
PD
Support item,
excluding
support
equipment,
is divided into the following sections:
procured
for
initial
issue
or
and
a. S e c t i o n I I . R e p a i r P a r t s L i s t . A list of repair
s t o c k e d only for subsequent or additional initial
parts
authorized
for
use
in
the
performance
of
issues
or
Not
subject
to
automatic
m a i n t e n a n c e . The list also includes parts which must be
replenishment.
removed
for
replacement
of
the
authorized
parts.
Parts
PE
Support equipment procured and stocked for
lists are composed of functional groups in ascending
specified
outfitting
to
initial
issue
or
numerical sequence with the parts in each group listed in
m a i n t e n a n c e repair activities.
figure and item number sequence. Bulk materials are listed
PF
Support
equipment
which
will
not
be
stocked
in NSN sequence.
b u t which will be centrally procured on demand.
III.
List.
Not
PG
Tools
Item
procured
and
stocked
to
provide
for
b. S e c t i o n
Special
s u s t a i n e d support for the life of the equipment.
applicable
National Stock Number (NSN)
It is applied to an item peculiar to the equipment
c. S e c t i o n
IV.
which, because of probable discontinuance or
and
Part
Number
Index. A
list
in
National
item
shutdown of production facilities, would prove
identification
number
(NIIN)
sequence,
of
all
National
uneconomical
to
reproduce
at
a
later
time.
s t o c k numbers (NSN) appearing in the listings, followed
KD
A n item of a depot overhaul/repair kit and not
by a list in alphanumeric sequence (e.g., MS will precede
purchased separately. Depot kit is defined as a
M1) of all part numbers appearing in the listings. National
k i t that provides items required at the time of
stock numbers and part numbers are cross-referenced to
overhaul or repair.
each
illustration
figure
and
item
number
appearance.
KF
A n item of a maintenance kit and not purchased
E-3.
Explanation
of
Columns.
s e p a r a t e l y . Maintenance kit is defined as a kit
The
following
p r o v i d e s an explanation of columns found in the tabular
that provides an item that can be replaced at
unit
or
intermediate
levels
of
listings:
aviation
maintenance.
This
column
is
divided
as
a. I l l u s t r a t i o n .
KB
I t e m included in both a depot overhaul/repair kit
follows:
and a maintenance kit.
(1) F i g u r e
number. Indicates the figure number
MO
Item
to
be
manufactured
or
fabricated
at
of the illustration in which the item is shown.
aviation unit level.
(2) I t e m n u m b e r . The number used to identify
Item
to
be
manufactured
or
fabricated
at
MF
each item called out in the illustration.
a v i a t i o n intermediate maintenance level.
MD
I t e m to be manufactured or fabricated at depot
Maintenance,
and
Recoverability
Source,
b.
maintenance level.
Codes (SMR).
Item
to
be
assembled
at
aviation
unit
level.
AO
(1) Source Code. Source codes are assigned to
AF
Item to be assembled at aviation intermediate
s u p p o r t items to indicate the manner of acquiring support
maintenance level.
i t e m s for maintenance, repair or overhaul of end items.
AD
Source codes are entered in the first and second positions
Item to be assembled at depot maintenance level.
XA
item is not procured or stocked because the
of
the
Uniform
SMR
Code
format
as
follows:
requirements
for
the
item
will
result
in
the
Definition
Code
replacement of the next higher assembly.
XB
Item is not procured or stocked. If not available
PA
I t e m p r o c u r e d a n d stocked for anticipated or
t h r o u g h salvage, requisition.
known
usage.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business