|
|
TM 9-1240-322-34&P
CHECKOUT PROCEDURE
SCOPE
Checkout of the Infinity Sight is done by using the flow chart procedures in this chapter. You must do the
checkout procedure from the beginning until a fault symptom is found. When it is, go to the fault
symptom index in Chapter 3. After you have corrected the fault, start at the beginning again and do the
checkout procedure until the Infinity Sight is working correctly.
CHECKOUT (SHEET 1 OF 9)
TEST EQUIPMENT: 0-50 VDC power supply
PERSONNEL One
Using power supply
REFERENCES: JPG 41C for:
Using multimeter
EQUIPMENT CONDITION: Infinity sight on work bench
PRELIMINARY PROCEDURES: Do inspection upon receipt (Vol II, para 3-2)
Vol I
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |