Click here to make tpub.com your Home Page

Page Title: CHAPTER 5 FINAL INSPECTION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-1220-220-34
CHAPTER 5
FINAL INSPECTION
5-1.
SCOPE
This chapter gives final inspection and maintenance procedures to be done after repairing the M10 Series Ballistics Drive.
5-2.
BALLISTICS DRIVE FINAL INSPECTION
PERSONNEL:
One
REFERENCES:
JPG 41C for cleaning
TM 10 for: Operating gun
Boresighting
(TM 9-2350-215-10 for M60A1,
TM 9-2350-257-10 for M60A1 Rise, and
TM 9-2350-260-10 for M60).
TM 20-2 for synchronizing and aligning (TM 9-2350-
215-20-2 for M60A1, TM 9-2350-257-20-2 for M60A1
Rise, and TM 9-2350-260-20-2 for M60)
EQUIPMENT CONDITION: Ballistics drive installed in vehicle
NOTE
If you find a fault, tell your supervisor. If you do not find a fault, send ballistics drive back into
service.
Para 5-1 Vol II
5-1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business