|
|
TM 9-1220-220-34
4-31.
JUNCTION BOX ASSEMBLY DISASSEMBLY
APPLICABLE CONFIGURATION: M10, M10A1, M10A5, and M10A6
TOOLS:
4 oz. hall peen hammer
1/8" and 3/8" punch
Spanner wrench (App C. para C-3)
5/64 socket head ,crew key (Allen wrench or equivalent)
Brass, drift pin
Vise
PERSONNEL:
One
EQUIPMENT CONDITION: Junction box assembly on work bench
FRAME 1
Step
Procedure
1.
Locate one pin (1) securing universal assembly (2) to junction box assembly (3).
2.
Using hammer and 1/8" punch, drive one pin (1) out of universal assembly (2).
3.
Remove universal assembly (2) from junction box assembly (3).
GO TO FRAME 2
Para 4-31 Vol II
4-74
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |