Click here to make tpub.com your Home Page

Page Title: BALLISTICS DRIVE INSPECTION UPON RECEIPT (CONT)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-1220-220-34
3-2.
BALLISTICS DRIVE INSPECTION UPON RECEIPT (CONT)
FRAME 6
Step
Procedure
Maintenance Action
Reference
1
Using 5/16' stud socket and
Tighten. Replace if missing.
...
ratchet, check that eight
screws (1) are tight.
2.
Check coupling assembly (2)
Send ballistics drive to depot.
...
for damage.
3.
Check that qualilfying plate
Clean. If still not able to
JPG 41C
(12) can be read.
read, tell your supervisor.
4.
Check that scales on spindle,
Clean. Replace if necessary.
JPG 41C
sleeve or cap (4) can be read.
5.
Check that two clamps (5)
Replace clamps if necessary.
are tight.
6.
Check that cotter pin (6) and
Replace missing or damaged
washer (7) are installed on
parts.
pin (8).
7.
Check that three wire seals
Replace missing wire seals, if
Para 4-5, frame 3,
(9) are installed.
installed in vehicle.
steps 3 and 7 and
frame 7, steps 3
and 7 and frame
12 steps 2 and 6
8.
Separate input shaft (10)
from junction box assembly
5, step 1.
(11).
9.
Check that input shaft (10)
Send ballistics drive to depot
...
of superelevation box
for repair.
assembly (12) turns freely
without binding.
10.
Connect input shaft (10) to
junction box assembly (11)
frame 8,
(electronic computer
step 2.
for M10A3)
NOTE
FOLLOW-ON
MAINTENANCE
Correct faults listed on DA
Form 2404 that may affect
performance test.
Do performance test (Vol I,
END OF TASK
Para 3-2 Cont Vol II
3-12

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business