|
|
TM 9-1025-212-23&P
2-6 Change 1
Section IV. PREPARATION FOR STORAGE OR SHIPMENT
a. When material is inactivated for a limited time (not
c. For M198 or M114A2 howitzer only, the socket wrench
extension is stored in the container with the extractor assembly.
to exceed 90 days), it will be processed in accordance with
T M 7 4 0 - 9 0 - 1 . For M114A2, M198 or M109A1 howitzer only,
One end is in the alinement support and the other end is
secured with a retaining strap assembly.
if possible, store extractor assembly in original container.
d. Prepare all Army shipping documents in accordance with
b. For M109A2 or M109A3 howitzer only, store extractor assem-
AR 55-355.
bly over right-side sponson.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |