Click here to make tpub.com your Home Page

Page Title: Section III. PRINCIPLES OF OPERATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Section III. PRINCIPLES OF OPERATION
b. For operating procedures for the extractor assembly, refer to
the appropriate operator's manual for your weapon system.
WEAPON SYSTEM
T M NUMBER
a. The extractor assembly is the only authorized piece of
e q u i p m e n t to be used to remove a rammed M712 projectile or
M114A2
Howitzer
TM 9-1025-200-12
M823 training projectile from the Self Propelled M109A1, M109A2,
M 1 9 8 Howitzer
TM 9-1025-211-10
M109A3,  M198  Towed,  or  M114A2  howitzer.  The  extractor  assem-
M109A1/M109A3
bly IS extended and then inserted into the breech of the howitzer
Howitzer
T M  9-2350-217-10N
where it engages the base of the projectile. The ratchet is turned
TM 9-2350-303-10
M109A2
Howitzer
and the projectile is pulled free of the forcing cone and can
be removed.
TM 9-1025-212-23&P
1-3(1-4 blank) Change 1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business