Unusual abbreviations, acronyms, and special usages of terms are explained herein. Refer to MIL-STD-12 for other
(common) abbreviations used in this manual.
A
B
C
CLOSURE Capping of disconnected fittings and connectors, overwrap and seal of disconnected electrical leads.
Sealoff of component gaps and joint openings.
COMPONENTWRAP Wrapping of removed components with barrier material or bubble wrap to protect against
damage or moisture.
CPG Copilotgunner.
D
DISASSEMBLY As used herein, describes the operation necessary to reduce an assembly or subassembly to
condition suitable for shipment.
E
F
FUSELAGE PACKAGE ITEMS Items that will be removed from the helicopter and stored in the helicopter during
shipment.
G
H
HIGHDENSITY (helicopter preloading condition) Helicopter partially disassembled for vessel shipment loading.
I
J
|