Click here to make tpub.com your Home Page

Page Title: Table 21. Equipment Requirements for AH-64A Helicopter C-5 and C-17 Cargo Aircraft Shipment (Sheet 3 of 3)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-1520-238-S
Table 21. Equipment Requirements for AH-64A Helicopter C-5 and C-17 Cargo Aircraft Shipment
(Sheet 3 of 3)
Part Number
Quantity
Item
Nomenclature
NSN
NOTES
(CAGE/LIN)
Required
Number
46
Jack, hydraulic tripod (3
1
2
ton)
47
Gauge, dial indicating
1
2
48
28 V dc adapter
5930-01-315-5178
70700-81650-045
1
3
49
Depinning Tool, 8 ga
5120-00-133-0158
*1
3
50
1-1/2 open-end wrench
1
2
* Asterisk by quantity indicates quantity per helicopter shipped. Quantities of other equipment items are
minimums. Quantities may be increased, based on number of aircraft and personnel.
NOTES:
1. Transportability peculiar items of equipment not included in Tables of Organization and Equipment
(TOE) and must be requisitioned for helicopter shipment.
2. Dual purpose item of equipment normally included in TOE.
3. Dual purpose equipment normally not included in TOE and must be requisitioned for helicopter
shipment.
4. Additional equipment required for C 5 rear door load (not required for C 17 load).
5. Not required for C 17 (Tactical) shipment.
28 HELICOPTER OFFLOADING.
27 HELICOPTER CARGO AIRCRAFT LOADING
AND TIEDOWN.
Detailed procedures are included for offloading heli
c
T
opters from the cargo aircraft upon arrival at the
shipment destination.
he prepared helicopter airframe and removed and
29 PREPARATION FOR USE AFTER SHIPMENT.
packaged components will be sequentially loaded and
Complete instructions are included to enable helicop
t
secured on the cargo aircraft in accordance with
er assembly, reconfiguration, refueling, checks and
instructions provided herein; aircraft floor plans in
d
test flight of helicopters after cargo aircraft shipment.
icate exact shipping positions on the cargo deck.
Change 8

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business