Click here to make tpub.com your Home Page

Page Title: Table 4-1. Instrument Leveling and Checks (Cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-6675-329-13 & P
Table 4-1. Instrument Leveling and Checks (Cont)
Operation
Normal Indication
Step
Corrective procedure
3
Sight instrument using open sight (Figure 1-2,
(cont)
item 5) and turning instrument by hand until it
is pointed at leveling staff.  Turn focusing
knob (9) to achieve normal indication.
Section IV: PREVENTIVE MAINTENANCE
4-8
PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS)
Table 4-2 presents recommended checks and services arranged in a logical sequence. These service items
should be performed at the indicated time interval. When the instrument is not used daily, it is not necessary to perform
the daily scheduled procedures. Instead, perform daily scheduled procedures before each use of the instrument.
Table 4-2. Organizational Preventive Maintenance
Checks and Services
D - Daily
W - Weekly
M - Monthly
EQUIPMENT IS
INTERVAL
ITEM
ITEM TO BE
PROCEDURES
NOT READY/
NO.  D W M
INSPECTED
AVAILABLE IF
1
Surveying
Perform operator preventive maintenance checks
Equipment does not
Level NA2-80
and services (Table 2-2).
pass all indicated
operator checks.
(Proceed to items
2 through 8 follow-
ing.)
2
Tripod Assy
Check Tripod Assy GST-40 leg(s) movement
Tripod shifts of
GST-40
for sufficient tightness to keep tripod stable
its own accord.
after it has been set up.