TM 5-6640-214-14
Table 3-1. Preventive Maintenance Checks and Services-Cont
NOTE: Within designated interval, these checks are to be performed in the order listed.
B - Before
A - After
M - Monthly
D - During
W - Weekly
C - Combat Operability Check
Interval
Item to be
Procedures
Equipment will
Item
Inspected
Check for and have repaired
be reported Not
No.
B
D
AWM
C
or adjusted as necessary.
Ready (Red) if:
X
Air receiver
Check all piping between
tank and
compressor and receiver
fittings
tank, and between receiver
tank and compressor air
pipe for any presence of
leaks. Make certain that
all connections are tight.
X
Air receiver
Drain receiver tank at least
drain
once a week to remove the
accumulation condensate,
make certain drain valve
is completely open.
X
Safety valve
Check for damage and any
accumulated dirt. Do not
change setting or remove
safety valve, the valve is
set by the manufacturer.
X
Pressure
Check for damage and any
switch
accumulated dirt. Do not
change setting of the
pressure switch.
X
Cylinders
Check to make sure that
cylinders are undamaged,
that connection threads are
clean and undamaged, and
that all connections are
tight. Do not attempt any
3-8
|