Click here to make tpub.com your Home Page

Page Title: Section II. SETTING-UP PROCEDURES
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-6640-214-14
Section II. SETTING-UP PROCEDURES
2-4. ARRANGING UNITS.
When an acceptable layout for the base petroleum laboratory has been decided upon, the equipment is placed in
position. Before cabinets are positioned, the pipe rack of each cabinet is raised and locked. After cabinets are placed in
position, they are leveled by means of the four leveling bolts. The units must fit tightly against one another and their tops
must be flush. Proposed layouts for the base laboratory are described below.
a. Quonset Hut Layout. The proposed layout for the petroleum base laboratory within a Quonset hut (fig. 2-3)
provides for the laboratory proper, a supply room, a washroom and an octane room. In figure 2-3, item numbers 1
through 26 are identical with unit numbers 1 through 26 in paragraph 1-8.  The cabinets, with their allied testing
equipment, are assembled along both side walls, the inside end wall, and along the center of the laboratory proper.
Figure 2-3. Proposed Layout for Petroleum Base Laboratory in Quonset Hut.
Change 1 2-4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business