|
|
TM 5-6640-213-14
1.
Leveling device
2.
Lift and tiedown points
3.
External water connection
Rear Three-Quarter View of Airmobile Aviation Fuel
Laboratory
NOTE
Throughout this manual, the term "front" refers to
the part of the laboratory in which the door is
located; the term "rear" to the opposite end. The
terms "right" and "left" indicate the directions
from the viewpoint of the operator as he stands
facing the door or as he enters the door of the
laboratory.
Shelter. The S-280 B/G military shelter is built of sep-
a.
arate panels attached and bonded in such a way that the shelter is
relatively airtight and waterproof. The roof, floor, end and side
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |